Highways Modernization Plan: Oahu Projects
|
OAHU Oahu Projects Map (PDF) |
||
|
The proposed Nimitz Highway Flyover would provide elevated, reversible express lanes
|
||
| Project Reference # |
Project Title |
Estimated Project Cost (in millions) |
| HIGHWAY SAFETY IMPROVEMENT PROGRAM (HSIP) | ||
| S2-101 | Kamehameha Highway Traffic Improvements, Kahekili Highway to Kaalaea Stream | $1.000 |
| S2-102 | Highway Roadway Safety Improvements at Various Locations | $7.094 |
| S2-103 | Kalanianaole Highway Safety Improvements in the Vicinity of Keolu Drive to Waimanalo Beach Park | $2.520 |
| S2-104 | Kamehameha Highway Safety Improvements in the Vicinity of Naniloa Loop (N) to Anemoku Street | $0.480 |
| S2-105 | Kamehameha Highway Safety Improvements in the Vicinity of Kualoa Ranch Road to Kamaka Place | $1.680 |
| S2-106 | Kamehameha Highway Safety Improvements in the Vicinity of Paalaa Uka Pupukea to Kamananui Road | $1.320 |
| Subtotal - HSIP | $14.094 | |
| BRIDGE PROGRAM | ||
| S3-101 | Kamehameha Highway, Hoolapa Stream (Nanahu)Bridge Replacement | $10.000 |
| S3-102 | Kamehameha Highway, Makaua Stream Bridge Rehabilitation | $5.000 |
| S3-103 | Kamehameha Highway, Waikane Stream Bridge Rehabilitation | $5.000 |
| S3-104 | Kamehameha Highway, Kalauoa Springs Stream Bridge Replacement | $10.000 |
| S3-105 | Bridge Rehabilitation, Replacement or Seismic Retrofit includes | $134.355 |
| S3-105A | Interstate H-1, H-2 and H-3 Structures | |
| S3-105B | Kalanianaole Highway, Inoaole Stream Bridge, Waimanalo | |
| S3-105C | Kamehameha Highway, Waiahole Bridge Replacement | |
| S3-105D | Kamehameha Highway, Kaipapau Stream Bridge Rehabilitation | |
| S3-105E | Kamehameha Highway, Kawela Stream Bridge Replacement/Rehabilitation | |
| S3-105F | Kamehameha Highway, Makaha Bridges #3 & #3A Replacement | |
| S3-105G | Kamehameha Highway, Kaluanui Stream Bridge Replacement | |
| Subtotal - Bridge Program | $164.355 | |
| ROCKFALL & SLOPE STABILIZATION PROGRAM | ||
| S4-101 | Rockfall Protection (Haleiwa, Kahuku, Pali Hwy) | $16.760 |
| S4-102 | Interstate Route H-1, School Street On-Ramp Retaining Wall Replacement | $8.000 |
| S4-103 | Kamehameha Highway, Rockfall Protection, Vicinity of Wahiawa Town | $5.000 |
| S4-104 | Kamehameha Highway, Rockfall Protection, Vicinity of North Shore | $5.000 |
| Subtotal - Rockfall & Slope Stabilization Program | $34.760 | |
| SHORELINE PROTECTION PROGRAM | ||
| S5-101 | Kamehameha Highway, Shoreline Protection, Vicinity of Punaluu | $5.300 |
| S5-102 | Kamehameha Highway Realignment, Haleiwa to Waimea Bay | $3.100 |
| S5-103 | Kamehameha Highway, Shoreline Protection, Vicinity of Hauula | $5.700 |
| S5-104 | Kamehameha Highway, Shoreline Protection, Vicinity of Kaaawa | $10.840 |
| S5-105 | Kamehameha Highway, Shoreline Protection, Vicinity of Kawailoa Beach | $1.700 |
| Subtotal - Shoreline Protection Program | $26.640 | |
| GUARDRAIL & SHOULDER IMPROVEMENT PROGRAM | ||
| S6-101 | Guardrail and Shoulder Improvements | $16.132 |
| Subtotal - Guardrail & Shoulder Improvement Program | $16.132 | |
| TOTAL - SAFETY PROGRAMS (28 projects) | $255.981 | |
|
Congestion relief is planned with the widening of an eastbound traffic bottleneck CONGESTION PROGRAMS |
||
| Project Reference # | Project Title |
Estimated Project Cost |
| CAPACITY PROGRAM | ||
| C1-101A | Kalanianaole Highway Improvements, Olomana Golf Course to Waimanalo Beach Park, Phase I | $12.480 |
| C1-101B | Kalanianaole Highway Improvements, Olomana Golf Course to Waimanalo Beach Park, Phase II | $12.000 |
| C1-102 | PM Contraflow from Paiwa Interchange to Waiawa Interchange, Phase I | $23.600 |
| C1-103 | Intersection Operational Improvements to Reduce Congestion | $7.800 |
| C1-104 | Interstate Route H-1 Corridor Improvements | $0.520 |
| C1-105 | Interstate Route H-1, Lunalilo Street Off-/On-Ramp | $1.080 |
| C1-106 | Interstate Route H-1, Kunia Interchange Improvements | $0.780 |
| C1-107 | Fort Barrette Road Widening, Farrington Highway to Barber's Point Gate | $22.450 |
| C1-108 | Interstate Route H-1, Kapolei Interchange, Phase 2 | $26.000 |
| C1-109 | Interstate Route H-1, Eastbound, Ward Avenue On-Ramp to University Interchange | $0.850 |
| C1-110 | Interstate Route H-1, Waiawa Interchange, Westbound, Waipahu Off-Ramp Improvements | $3.120 |
| C1-111 | Interstate Route H-1 Widening, Eastbound, Waiau Interchange to Halawa Interchange, Phase I | $4.160 |
| C1-112 | PM Contraflow from Keehi Interchange to Waiawa Interchange | $50.000 |
| C1-113 | Interstate Route H-1, Ola Lane to Vineyard Boulevard, Widening, Eastbound | $100.000 |
| C1-114 | Nimitz Viaduct, Keehi Interchange to Pacific Street | $600.000 |
| Subtotal - Capacity Program | $864.840 | |
![]() An artist's concept drawing illustrates the H-1 Freeway PM Contraflow which would provide an additional westbound lane from the Keehi Interchange west to the Paiwa Interchange during afternoon rush-hour traffic. FREEWAY MANAGEMENT SYSTEM (FMS) PROGRAM |
||
| Freeway Management System (FMS): Phase 1A |
- |
|
| Freeway Management System (FMS): Phase 1B - Part 1 |
- |
|
| C2-101A | Freeway Management System (FMS): Phase 1B - Part 2 | $4.000 |
| C2-101B | Freeway Management System (FMS): Phase 1C | $18.000 |
| C2-101C | Freeway Management System (FMS): Phase 2A | $18.000 |
| C2-101D | Freeway Management System (FMS): Phase 2B | $13.300 |
| C2-101E | Freeway Management System (FMS): Phase 3A | $11.000 |
| C2-101F | Freeway Management System (FMS): Phase 4 | $10.000 |
| C2-101G | Freeway Management System (FMS): System Manager | $6.000 |
| C2-101H | Freeway Management System (FMS): Operations/Maintenance | $9.600 |
| C2-101I | Freeway Management System (FMS): Freeway Service Patrol (Interstate H-1, H-2, H-201 and H-3) | $21.000 |
| Subtotal - Freeway Management System (FMS) Program | $110.900 | |
![]() Traffic flow and commute times will be improved with traffic signal optimization projects along such major routes as Farrington Highway from Nanakuli to Makaha. TRAFFIC SIGNAL OPTIMIZATION PROGRAM |
||
| C3-101A | Traffic Signal Opt: Farrington Highway, Waipio Point Access Road to Kunia Road | $2.800 |
| C3-101B | Traffic Signal Opt: Farrington Highway, Nanakuli to Makaha | $2.160 |
| C3-101C | Traffic Signal Opt: Nimitz Highway, Valkenburg Street to Ahua Street | $2.160 |
| C3-101D | Traffic Signal Opt: Kamehameha Highway, Lanikuhana Avenue to Kuahelani Avenue | $2.800 |
| C3-101E | Traffic Signal Opt: Kamehameha Highway, Leilehua Golf Course Road to Interstate Route H-2 Off-Ramp | $2.800 |
| C3-101F | Traffic Signal Opt: Likelike Highway, Kamehameha IV Road to School Street | $0.860 |
| C3-101G | Traffic Signal Opt: Kalanianaole Highway, Castle Junction to Kailua Road | $1.500 |
| C3-101H | Traffic Signal Opt: Kahekili Highway, Haiku Road to Hui Iwa Street | $0.325 |
| Subtotal - Traffic Signal Optimization Program | $15.405 | |
| BICYCLE PROGRAM | ||
| C4-101A | Leeward Bikeway, Phase I, Waipio Point Access Road to Hawaii Railroad Society Train Station | $4.000 |
| C4-101B | Leeward Bikeway, Phase II, Hawaii Railroad Society Train Station to Lualualei Naval Road | $5.000 |
| C4-102 | Kalanianaole Highway Bicycle Improvements, Waimanalo Beach Park to Makapuu Lookout | $2.200 |
| Subtotal - Bicycle Program | $11.200 | |
| TOTAL - CONGESTION PROGRAMS (35 projects) | $1,002.345 | |
|
SYSTEM PRESERVATION PROGRAMS |
||
| Project Reference # | Project Title |
Estimated Project Cost |
| PAVEMENT PRESERVATION | ||
| P1-101 | Pavement Preservation, Oahu | $58.000 |
| Subtotal - Pavement Preservation | $58.000 | |
|
REHABILITATION PROGRAM |
||
| P2-101A | Interstate Route H-1, Pearl City & Waimalu Viaduct Improvements | $2.250 |
| P2-101B | Interstate Route H-1, Pearl City & Waimalu Viaduct Improvements, Phase 1 | $15.000 |
| P2-101C | Interstate Route H-1, Pearl City & Waimalu Viaduct Improvements, Phase 2 | $15.000 |
| P2-101D | Interstate Route H-1, Pearl City & Waimalu Viaduct Improvements, Phase 3 | $15.000 |
| P2-101E | Interstate Route H-1, Pearl City & Waimalu Viaduct Improvements, Phase 4 | $10.000 |
| Subtotal - Rehabilitation Program | $57.250 | |
| DRAINAGE IMPROVEMENT PROGRAM | ||
| P3-101 | Drainage Improvements | $10.850 |
| Subtotal - Drainage Improvement Program | $10.850 | |
| STREET LIGHT POLE REPLACEMENT PROGRAM | ||
| P4-101 | Highway Lighting Improvements (Interstate H-1 & H-201, Kamehameha Highway) | $30.000 |
| Subtotal - Street Light Pole Replacement Program | $30.000 | |
| DESTINATION SIGN REPLACEMENT PROGRAM | ||
| P5-101 | Interstate Route H-1, H-2 & H-3 Destination Sign Upgrade/Replacement, Ph I & II | $60.500 |
| Subtotal - Destination Sign Replacement Program | $60.500 | |
|
Needed road maintenance projects will include lane restriping and resurfacing
|
||
| P6-101 | Asphalt overlays, asphalt cold planing and paving (in-kind) and re-striping | $124.800 |
| Subtotal - Special Maintenance Program | $124.800 | |
| OPERATION & MAINTENANCE PROGRAM | ||
| P7-101 | Pavement sealing, pothole patching and crack filling | $297.300 |
| Subtotal - Special Maintenance Program | $297.300 | |
| LANDSCAPING PROGRAM | ||
| P8-101 | Landscaping Improvements, Various Locations on Oahu | $2.507 |
| Subtotal - Landscaping Program | $2.507 | |
| TOTAL - SYSTEMS PRESERVATION PROGRAM (12 projects) | $641.207 | |
|
OTHER PROGRAMS |
||
| Project Reference # | Project Title |
Estimated Project Cost |
| ENVIRONMENTAL PROGRAM | ||
| O5-101 | Kamehameha Highway Wetland Enhancement, Vicinity of Ukoa Pond | $5.500 |
| TOTAL - OTHER PROGRAMS (1 project) | $5.500 | |
| TOTAL - OAHU (76 projects) | $1,905.033 | |
|
||