"TECHNICAL INFEASIBILITY" Provisions of
the
Americans with Disabilities Act Accessibility
Guidelines (ADAAG)
ADAAG
contains a provision relating to "technical infeasibility",
applicable only in alterations.
This exception does not apply to new construction. The provision is as follows:
4.1.6 Accessible Buildings: Alterations (1) General...
(j)
Exception: In alteration
work, if compliance with 4.1.6 is technically infeasible, the alteration shall
provide accessibility to the maximum extent feasible. Any elements or features of the building or facility that
are being altered and can be made accessible shall be made accessible within
the scope of the alteration.
Technically Infeasible. Means, with respect to an alteration of a building or a
facility, that it has little likelihood of being accomplished because existing
structural conditions would require removing or altering a load-bearing member
which is an essential part of the structural frame; or because other existing
physical or site constraints prohibit modification or addition of elements,
spaces, or features which are in full and strict compliance with the minimum
requirements for new construction and which are necessary to provide
accessibility.
"
TECHNICAL INFEASIBILITY" STATEMENT
Relating to a project under
review for §103-50, HRS
Project
Name: __________
Dept.
Project Number: _____
DCAB Project Number: ____ (If
applicable)
The
following item in the planned alteration project is not in full compliance with
ADAAG as noted in the review by the Disability and Communication Access
Board. As determined by the
Department overseeing the project and/or the project consultant, this
alteration item does provide a level of accessibility to the maximum extent
feasible in compliance with ADAAG 4.1.6(j).
Reference
to DCAB Document Review Dated: (If
applicable) Item
Number: (If
applicable)
Explanation
of why item is "Technically Infeasible" (attach additional sheets,
drawings, sketches as necessary):
I/We
acknowledge that responsibility for determining "technical
infeasibility", including research/analysis of alternate design(s), rests
with the Department/Agency overseeing the project and the project consultant.
*Note: If signing for Department Director,
please submit memo confirming such authorization.